Similar to temporary shoring, bracing includes variables that need to be evaluated before a system can be installed. Bracing/stabilization is critical in new construction, selective demolition or while a permanent solution is being developed or implemented. Whether ACC is bracing a wall as a preventative measure, or if movement or shifting has been noted, we carefully evaluate all potential influences including weather, activity, accessibility and loads received. Even the smallest bracing jobs require an experienced team approach. Over the past 7 years ACC has been able to stabilize the first landmarked ruin in New York, as well as a number of other historical structures, churches, houses and retaining walls.